REACH A LEVEL BEYOND EXPECTATIONS
Custom designed laydown systems Overcome unique obstacles and win the job whether you’re dealing with 4-story or 100+ story buildings, dams, or other commercial concrete pumping and placing situations.
Perfect products for high-pressure situations
CLEAN-OUT TOWER WS50D
Laydown design is nothing without high- quality pipe, elbows, valves, couplings, and cleanout to handle high pressure and prevent blow outs. Sustainable, cost-effective pipe Heat-treated for longevity and environmental consciousness, our 3/8" wall pipe lasts 3-5 times longer than our industry-best, non-hardened pipe. Plus, you gain the best yardage per dollar invested with this long-term solution.
CONFORMS.COM | 37
Powered by FlippingBook